Publications: Dr Eun-Seok Kim
Choi B-C, Kim E-S, Lee J-H
(
2024
)
.
Scheduling step-deteriorating jobs on a single machine with multiple critical dates
.
Journal of the Operational Research Society
vol.
ahead-of-print
,
(
ahead-of-print
)
1
-
11
.
Karimi-Zare A, G. HS, Kazemi A, Kim E-S
(
2024
)
.
Aggregate production planning and energy supply management in steel industry with an onsite energy generation system: A multi-objective robust optimization model
.
International Journal of Production Economics
vol.
269
,
Kim E-S, Lee IS
(
2024
)
.
Heuristic approaches for scheduling of a two-machine flowshop with outsourcing lead-time
.
Engineering Optimization
vol.
56
,
(
12
)
2431
-
2449
.
Kim E-S, Lee IS
(
2022
)
.
Scheduling of two-machine flowshop with outsourcing lead-time
.
Computers and Operations Research
Kim H-J, Kim E-S, Lee J-H, Tang L, Yang Y
(
2021
)
.
Single Machine Scheduling with Energy Generation and Storage Systems
.
International Journal of Production Research
Kim H-J, Kim E-S, Lee J-H
(
2021
)
.
Scheduling of step-improving jobs with an identical improving rate
.
Journal of the Operational Research Society
Kazemi A, Kim E-S, Kazemi M-H
(
2020
)
.
Identifying and prioritizing delay factors in Iran’s oil construction projects
.
International Journal of Energy Sector Management
Asimit AV, Gao T, Hu J, Kim E-S
(
2018
)
.
Optimal Risk Transfer: A Numerical Optimisation Approach
.
North American Actuarial Journal
Kim E-S, Oron D
(
2017
)
.
Minimizing total completion time on a single machine with step improving jobs
.
Journal of the Operational Research Society
vol.
66
,
(
9
)
1481
-
1490
.
Asimit AV, Bignozzi V, Cheung KC, Hu J, Kim E-S
(
2017
)
.
Robust and Pareto optimality of insurance contracts
.
European Journal of Operational Research
vol.
262
,
(
2
)
720
-
732
.
Eun J, Sung CS, Kim E-S
(
2017
)
.
Maximizing total job value on a single machine with job selection
.
Journal of the Operational Research Society
vol.
68
,
(
9
)
998
-
1005
.
Asimit AV, Badescu AM, Haberman S, Kim E-S
(
2016
)
.
Efficient risk allocation within a non-life insurance group under Solvency II Regime
.
Insurance: Mathematics and Economics
vol.
66
,
Article
C
,
69
-
76
.
Kim E-S, Glass CA
(
2015
)
.
Perfect periodic scheduling for binary tree routing in wireless networks
.
European Journal of Operational Research
vol.
247
,
(
2
)
389
-
400
.
Kim E-S, Glass CA
(
2013
)
.
Perfect periodic scheduling for three basic cycles
.
Journal of Scheduling
vol.
17
,
(
1
)
47
-
65
.